storj/private/testuplink
Michał Niewrzał 8685c6c9cd private/testplanet: use better method in test
In ec client in uplink we have two methods Put and PutSingleResult. Logic is the same but result for PutSingleResult is combined into single var. We would like to remove unused Put method but to do this it needs to be replaced in test.

Change-Id: Ia65eff3ecc9e68d5b3180b557ea82fa31d3c969c
2021-02-16 13:24:01 +00:00
..
client_planet_test.go private/testplanet: use better method in test 2021-02-16 13:24:01 +00:00
doc.go uplink: avoid cyclic dependency to storj.io 2020-01-08 14:51:33 +02:00