storj/internal/testplanet
Jeff Wendling 5ab8c9d052 transport: separate dial from request timeouts (#1940)
A previous change reused the same timeout for dialing as well as
requesting in order to speed up some tests. This change introduces
a distinct timeout so that the different operations can have different
timeouts.
2019-05-10 14:26:25 +03:00
..
planet_test.go Refactor pb.Node protobuf (#1785) 2019-04-22 12:07:50 +03:00
planet.go storage node collector (#1913) 2019-05-08 14:11:59 +03:00
reconfigure.go dial node/address with bad server cert (#1342) 2019-02-26 19:35:16 +01:00
run_test.go Ensure that tally tests run against postgres (#1227) 2019-02-05 16:23:45 +02:00
run.go Refactor pb.Node protobuf (#1785) 2019-04-22 12:07:50 +03:00
uplink_test.go Download is hanging when one node is not responsive (#1764) 2019-04-25 10:17:26 +02:00
uplink.go transport: separate dial from request timeouts (#1940) 2019-05-10 14:26:25 +03:00