1fecaed7df
nodes are submitting using both the legacy and windowed endpoints and thus having their legacy submissions rejected. it is legal to use both the legacy and windowed endpoints in phase1 since they use the same backend. the legacy endpoint is disabled in phase2 and phase3. therefore, if we wait an order expiration period (2 days) after we determine enough nodes have started using the windowed endpoint, we can be sure that any orders they did have to submit with the legacy endpoint will have expired. Change-Id: I4418a881bf8bb9377efaef4c651e6103a5dc6ed0 |
||
---|---|---|
.. | ||
encryptionkey_test.go | ||
encryptionkey.go | ||
endpoint_test.go | ||
endpoint.go | ||
orders_test.go | ||
rollups_chore.go | ||
rollups_write_cache_test.go | ||
rollups_write_cache.go | ||
serials_test.go | ||
service.go | ||
signer_test.go | ||
signer.go | ||
window_endpoint_phase.go |