Commit Graph

10 Commits

Author SHA1 Message Date
Egon Elbre
080ba47a06 all: fix dots
Change-Id: I6a419c62700c568254ff67ae5b73efed2fc98aa2
2020-07-16 14:58:28 +00:00
Kaloyan Raev
a2ce836761 remove sugar logging
Change-Id: I6b6ca9704837cb3f5f5449ba7f55661487814d9f
2020-04-15 12:37:47 +00:00
Egon Elbre
8f73fb7a32 all: simplify uuid usage
uuid.UUID implements driver.Value so it can be directly used as a
scannable result.

Replace uses of dbutil.BytesToUUID with uuid.FromBytes.

Change-Id: I51a670185ceb3cc2199d5aa2b76bc3fc191ca8fe
2020-04-02 05:48:58 +00:00
Egon Elbre
0a69da4ff1 all: switch to storj.io/common/uuid
Change-Id: I178a0a8dac691e57bce317b91411292fb3c40c9f
2020-03-31 19:16:41 +03:00
Jeff Wendling
77fd41a02e satellite: add an expiring lru cache around api keys
Change-Id: I995429c66affd33da59b091f28f09ca122070b5e
2020-01-09 22:13:41 -07:00
Egon Elbre
6615ecc9b6 common: separate repository
Change-Id: Ibb89c42060450e3839481a7e495bbe3ad940610a
2019-12-27 14:11:15 +02:00
Andrew Harding
62c58f4a9a satellite: consistent report range arguments
This change updates the three satellite report commands that accept date
ranges to parse and treat those dates uniformly.

- End dates are now uniformly exclusive. Exclusive end dates helps
operators avoid one-off errors on month boundaries, as in the operator
does not have to remember how many days are in that month and can just
run the report from the 1st (inclusive) through the 1st (exclusive).
- Fixed the date range validity check which only failed if the start
date came after the end date (it should have failed dates that were
equal since the check happened after adjusting for inclusivity).

Change-Id: Ib2ee1c71ddb916c6e1906834d5ff0dc47d1a5801
2019-12-20 17:17:09 +00:00
Vitalii Shpital
53d9bc4530
storagenode/notifications: db created (#3707) 2019-12-16 19:59:01 +02:00
Egon Elbre
ee6c1cac8a
private: rename internal to private (#3573) 2019-11-14 21:46:15 +02:00
ethanadams
0e528bc56e
Add attribution report to the satellite CLI (#2288)
* added satalite partner value attribution report. WIP

* WIP

* basic attribution report test completed. still a WIP

* cleanup

* fixed projectID conversion

* report display cleanup

* cleanup .added more test data

* added partnerID to query results

* fixed lint issues

* fix import order

* suggestions from PR review

* updated doc to reflect implementation

* clarification comments in the report SQL

* Changed based on PR suggestion

* More changes based on PR suggestions

* Changes based on PR suggestions

* reordered tests to make consistant with previous 2

* small comments cleanup

* More PR suggestions

* fixed lint issue and removed printf

* fixed var name

* Updates based on PR suggestions

* fixed message

* fixed test

* changes required after merge from master
2019-06-25 16:58:38 -04:00