rate
Graceful exit is very slow at the moment. Over the last couple days we
increase the batch size on Stefans satellite to 1000 but as a side
effect the error rate was increased. With a batch size of 500 the error
rate looks stable.
This PR will increase the default to batch size to 300. Graceful exit
will still be painful slow but at least it will be a bit faster. At the
same time this PR also increases the number of errors we tolerate. We
don't want to DQ slow storage nodes just because they didn't finish all
300 transfers in time. We want to give them more retries.
Change-Id: I92e3f99e116d4988457d8b902a88e85ed1bcc1a7
this commit updates our monkit dependency to the v3 version where
it outputs in an influx style. this makes discovery much easier
as many tools are built to look at it this way.
graphite and rothko will suffer some due to no longer being a tree
based on dots. hopefully time will exist to update rothko to
index based on the new metric format.
it adds an influx output for the statreceiver so that we can
write to influxdb v1 or v2 directly.
Change-Id: Iae9f9494a6d29cfbd1f932a5e71a891b490415ff
Adds check to see if storage nodes are eligible to initiate
graceful exit, by checking their CreatedAt date and seeing if
their "age" is greater than the new config value:
NodeMinAgeInMonths
The default for this value is 6 months for now.
https://storjlabs.atlassian.net/browse/V3-3357
Change-Id: Ib807ab8987ddb5a38a27a83886490f73fe8c5816
* add overall failure percentage check and inactive time frame check before sending a response to sno
* update comment
* delete node from transfer queue if it has been inactive for too long
* fix linting error
* add test config value
* fix nil pointer
* add config value into testplanet
* add unit test for overall failure threshold
* move timeframe threshold to chore
* update protolock
* add chore test
* add per peiece failure count logic
* change config name from EndpointMaxFailures to MaxFailuresPerPiece
* address comments
* fix linting error
* add error handling for no row returned from progress table
* fix test for graceful exit chore on storagenode
* fix typo InActive -> Inactive
* improve readability for failure threshold calculation
* update config lock
* change error handling for GetProgress in graceful exit endpoint on the satellite side
* return proper rpc error in endpoint
* add check in chore test for checking finish timestamp and queue
* update lock file and add comment
* add created at and bytes transferred
* cleanup
* rename db func to GetGracefulExitNodesByTimeFrame
* fix flag
* split into two overlay functions
* := to =
* fix test
* add node not found error class
* fix overlay test
* suggested test changes
* review suggestions
* get exit status from overlay.Get()
* check rows.Err
* fix panic when ExitFinishedAt is nil
* fix comments in cmdGracefulExit