This enables the transfer of pieces from an on-going multipart upload.
Tests are also modified to take into account pending multipart uploads.
See https://storjlabs.atlassian.net/browse/PG-161
Change-Id: I35d433c44dd6e618667e5e8f9f998ef867b9f1ad
metabaseSegmentKey` TransferQueueItem
We are unifying which name (and type) we are using for value we are
using to point to segment. We want to use `key` instead of `path`.
Dedicated type `metabase.SegmentKey` was created for this purposes also.
This change is doing refactoring around gracefulexit.
Change-Id: I90d51ff087b206179e61d5f1bc95f4709d76f917
This runs each benchmark for one iteration to ensure that they are
valid. Unfortunately, it does not give any useful metrics as output.
Change-Id: I68940398c8dd849aed656bd12656f48d5df10128
With this change RS configuration will be set on satellite. Uplink with
get RS values with BeginObject request and will use it. For backward
compatibility and to avoid super large change redundancy scheme stored
with bucket is not touched. This can be done in future.
Change-Id: Ia5f76fc10c37e2c44e4f7b8754f28eafe1f97eff
Remove direct dependency on uplink.RSConfig, this simplifies
moving the config file without introducing weird dependencies.
Change-Id: I7fd2a145401e0205d7047631df9d2810241efeec
* add overall failure percentage check and inactive time frame check before sending a response to sno
* update comment
* delete node from transfer queue if it has been inactive for too long
* fix linting error
* add test config value
* fix nil pointer
* add config value into testplanet
* add unit test for overall failure threshold
* move timeframe threshold to chore
* update protolock
* add chore test
* add per peiece failure count logic
* change config name from EndpointMaxFailures to MaxFailuresPerPiece
* address comments
* fix linting error
* add error handling for no row returned from progress table
* fix test for graceful exit chore on storagenode
* fix typo InActive -> Inactive
* improve readability for failure threshold calculation
* update config lock
* change error handling for GetProgress in graceful exit endpoint on the satellite side
* return proper rpc error in endpoint
* add check in chore test for checking finish timestamp and queue