Fixes a data race caused by not waiting for workers to finish
before shutting down. Currently this ended up failing logging
because it was closed when test tried to write to it.
Change-Id: I074045cd83bbf49e658f51353aa7901e9a5d074b
planet.Start starts a testplanet system, whereas planet.Run starts a testplanet
and runs a test against it with each DB backend (cockroach compat).
Change-Id: I39c9da26d9619ee69a2b718d24ab00271f9e9bc2
* put TestCreateV0 back in StoreForTest
* avoid direct handles to V0 pieceinfo db
* type mismatch fix
* use storage.Blobs interface in store_test.go
..instead of filestore.Store. this will allow filestore.Store to become
unexported.
* unexport filestore.Store
rename it to blobStore. things should use the storage.Blobs interface
instead. changes in this commit are purely mechanical (made through the
"refactor" tool in Gocode followed by search/replace on the word "Store"
within the storage/filestore/ directory).
* kill filestore.StoreForTest
now that filestore.blobStore is unexported, there isn't a need for a
specialized wrapper type. this (not coincidentally) also makes it
possible for the WriterForFormatVersion() method on
storagenode/pieces.StoreForTest to work, without requiring everything to
wrap the store.blobs attribute in a filestore.StoreForTest, which was
impractical.
* Make the exiting node check piece hashes, piece IDs, and piece hash signatures before relaying successful transfer data to the satellite.
* Enable immediate graceful exit failure for "successful" transfers that fail satellite-side validation.
* Move transfer piece logic in storagenode worker to separate function (to make the worker easier to understand)
* add overall failure percentage check and inactive time frame check before sending a response to sno
* update comment
* delete node from transfer queue if it has been inactive for too long
* fix linting error
* add test config value
* fix nil pointer
* add config value into testplanet
* add unit test for overall failure threshold
* move timeframe threshold to chore
* update protolock
* add chore test
* add per peiece failure count logic
* change config name from EndpointMaxFailures to MaxFailuresPerPiece
* address comments
* fix linting error
* add error handling for no row returned from progress table
* fix test for graceful exit chore on storagenode
* fix typo InActive -> Inactive
* improve readability for failure threshold calculation
* update config lock
* change error handling for GetProgress in graceful exit endpoint on the satellite side
* return proper rpc error in endpoint
* add check in chore test for checking finish timestamp and queue
* add exit-status command
* remove todo and fix format
* fix status display
* change startExit to exit progress
* fix linting error
* add successful column in exit progress
* fix test
* remove extra new line
* fix TYPOS
* format the percentage better