Currently storage tests were tied to the default lookup limit.
By increasing the limits, the tests will take longer and sometimes
cause a large number of goroutines to be started.
This change adds configurable lookup limit to all storage backends.
Also remove boltdb.NewShared, since it's not used any more.
Change-Id: I1a052f149da471246fac5745da133c3cfc27582e
Currently Cockroach DB setup takes a significant amount of time.
This flattens the database setup into a single query,
which improves the test time significantly.
The migration tests still test each migration separately.
Change-Id: Iaca16f34a6af3926fa2b5ebf618f939fd59460b3
With this change RS configuration will be set on satellite. Uplink with
get RS values with BeginObject request and will use it. For backward
compatibility and to avoid super large change redundancy scheme stored
with bucket is not touched. This can be done in future.
Change-Id: Ia5f76fc10c37e2c44e4f7b8754f28eafe1f97eff
Since incoming times may be in any time zone, and we want the output
to be in UTC and for them to have 00:00:00 hours, minutes and seconds
we first convert the incoming timestamp to UTC before doing the
truncate to the day and adding a day.
Because the old code always returned a timestamp that was in the
future, this is just for efficiency.
Change-Id: Ie692d47bca8691e73852c822d5c56cf8773d99b4
Limits how many times metainfo APIs can be called per second by project ID. If limit is exceeded, the API will return Unauthorized/Too Many requests.
Limit per second and the size of the limiter cache per project are configurable, as well as whether the limiter is enabled.
Tests added/updated for the new rate_limit field in projects table.
Tests added for exceeding limits and disableing limiter.
Change-Id: Ic8ad102de3b690a475809d4f684156d5715f20fa
This change is a special case for batch processing. If in batch request
CommitSegment and CommitObject are one after another we can execute
these request as one. This will avoid current logic where we are saving
pointer for CommitSegment and later we are deleting this pointer and
saving it once again as under last segment path for CommitObject.
Change-Id: If170e78c8410f5ba5916cbff6a29b9221db9ce2e
Replace all the remaining uses of sql.DB with tagsql.DB to
fix issues with context cancellation.
Introduce tagsql.Open which helps to get rid of all tagsql.Wrap-s.
Use tagsql in cockroachkv and postgreskv.
Change-Id: I8946d203341cb85a25976896fc7881e1f704e779
Not having a skew caused an issue where:
1. Uplink calls "begin segment", where segment isn't committed to the
database.
2. Uplink stores piece X to the storage node A with timestamp 1.
3. Satellite runs garbage collection with timestamp 2.
4. Satellite sends retain request to storage node A with timestamp 2.
5. Storage node A deletes piece X, because 1 < 2.
6. Uplink calls "commit segment" with storage node A in it.
7. Download of segment fails, because A doesn't have piece X.
In production this is not an issue since the MaxTimeSkew is 72h by
default.
Change-Id: Id87ca3ddc44103dcd85d031b1367168c014b8e7b
Also added temporary types withRebind and withTagTx,
which will be later removed. Currently they help to avoid
changing the whole codebase at the same time.
Change-Id: I7f07ba8f4709a23a463bfa67464628665a05808f
warning: databases migrated to version 77 before this commit
is merged must be manually re-migrated. this should not be a
problem for anything but staging databases.
Change-Id: Ie1631c48379472352014183ee43f1465e22200f7
live accounting used to be a cache to store writes before they are picked up during
the tally iteration, after which the cache is cleared. This created a window in which
users could potentially exceed the storage limit. This PR refactors live accounting to
hold current estimations of space used per project. This should also reduce DB load
since we no longer need to query the satellite DB when checking space used for limiting.
The mechanism by which the new live accounting system works is as follows:
During the upload of any segment, the size of that segment is added to its respective
project total in live accounting. At the beginning of the tally iteration we record
the current values in live accounting as `initialLiveTotals`. At the end of the tally
iteration we again record the current totals in live accounting as `latestLiveTotals`.
The metainfo loop observer in tally allows us to get the project totals from what it
observed in metainfo DB which are stored in `tallyProjectTotals`. However, for any
particular segment uploaded during the metainfo loop, the observer may or may not
have seen it. Thus, we take half of the difference between `latestLiveTotals` and
`initialLiveTotals`, and add that to the total that was found during tally and set that
as the new live accounting total.
Initially, live accounting was storing the total stored amount across all nodes rather than
the segment size, which is inconsistent with how we record amounts stored in the project
accounting DB, so we have refactored live accounting to record segment size
Change-Id: Ie48bfdef453428fcdc180b2d781a69d58fd927fb
this commit introduces the reported_serials table. its purpose is
to allow for blind writes into it as nodes report in so that we have
minimal contention. in order to continue to accurately account for
used bandwidth, though, we cannot immediately add the settled amount.
if we did, we would have to give up on blind writes.
the table's primary key is structured precisely so that we can quickly
find expired orders and so that we maximally benefit from rocksdb
path prefix compression. we do this by rounding the expires at time
forward to the next day, effectively giving us storagenode petnames
for free. and since there's no secondary index or foreign key
constraints, this design should use significantly less space than
the current used_serials table while also reducing contention.
after inserting the orders into the table, we have a chore that
periodically consumes all of the expired orders in it and inserts
them into the existing rollups tables. this is as if we changed
the nodes to report as the order expired rather than as soon as
possible, so the belief in correctness of the refactor is higher.
since we are able to process large batches of orders (typically
a day's worth), we can use the code to maximally batch inserts into
the rollup tables to make inserts as friendly as possible to
cockroach.
Change-Id: I25d609ca2679b8331979184f16c6d46d4f74c1a6
everyone was importing it as dbx anyway. why should it be
named satellitedb? so yeah just pass the "-p dbx" flag.
Change-Id: I5efa669f4f00f196b38a9acd0d402009475a936f
Create a service for deleting pieces of storage nodes.
Currently the DeletePieces method returns after a success threshold,
completion or a timeout.
The end goal is to return when reaching the success threshold and
leaving the remaining goroutines running after DeletePieces method
returns and add a life cycle to the service that it waits for them when
it closes.
This is the first commit for ticket:
https://storjlabs.atlassian.net/browse/V3-3476
Change-Id: If740bbf57c741f880449980b8176b036dd956c7b
This reverts commit 8e242cd012.
Revert because lib/pq has known issues with context cancellation.
These issues need to be resolved before these changes can be merged.
Change-Id: I160af51dbc2d67c5449aafa406a403e5367bb555
this will allow for some nice runtime analysis down the road.
also, this allows for wrapping database handles in a way that
can interact with these contexts
requires https://review.dev.storj.io/c/storj/dbx/+/514
Change-Id: Ib087b7cd73296dd2c1e0331314da34d861f61d2b
this allows for setting $STORJ_METAINFO_POSTGRESQL_USE_ALT=yes if you
want to use the cockroachkv implementation for metainfo against postgres
Change-Id: I0c9458c83fd67ee63ef4a78351e64a80a0647408