Remove direct dependency on uplink.RSConfig, this simplifies
moving the config file without introducing weird dependencies.
Change-Id: I7fd2a145401e0205d7047631df9d2810241efeec
Adds check to see if storage nodes are eligible to initiate
graceful exit, by checking their CreatedAt date and seeing if
their "age" is greater than the new config value:
NodeMinAgeInMonths
The default for this value is 6 months for now.
https://storjlabs.atlassian.net/browse/V3-3357
Change-Id: Ib807ab8987ddb5a38a27a83886490f73fe8c5816
Fixes a data race caused by not waiting for workers to finish
before shutting down. Currently this ended up failing logging
because it was closed when test tried to write to it.
Change-Id: I074045cd83bbf49e658f51353aa7901e9a5d074b
* If a node claims to fail a transfer due to piece not found, remove that node from the pointer, delete the transfer queue item.
* If the pointer is piece hash verified, penalize the node. Otherwise, do not penalize the node.
* check duplicate node id before update pointer
* add test for transfer failure when pointer already contain the receiving node id
* check exiting and receiving nod are still in the pointer
* check node id only exists once in a pointer
* return error if the existing node doesn't match with the piece info in the pointer
* try to recreate the issue on jenkins
* should not remove exiting node piece in test
* Update satellite/gracefulexit/endpoint.go
Co-Authored-By: Maximillian von Briesen <mobyvb@gmail.com>
* Update satellite/gracefulexit/endpoint.go
Co-Authored-By: Maximillian von Briesen <mobyvb@gmail.com>
* Make the exiting node check piece hashes, piece IDs, and piece hash signatures before relaying successful transfer data to the satellite.
* Enable immediate graceful exit failure for "successful" transfers that fail satellite-side validation.
* Move transfer piece logic in storagenode worker to separate function (to make the worker easier to understand)
* add overall failure percentage check and inactive time frame check before sending a response to sno
* update comment
* delete node from transfer queue if it has been inactive for too long
* fix linting error
* add test config value
* fix nil pointer
* add config value into testplanet
* add unit test for overall failure threshold
* move timeframe threshold to chore
* update protolock
* add chore test
* add per peiece failure count logic
* change config name from EndpointMaxFailures to MaxFailuresPerPiece
* address comments
* fix linting error
* add error handling for no row returned from progress table
* fix test for graceful exit chore on storagenode
* fix typo InActive -> Inactive
* improve readability for failure threshold calculation
* update config lock
* change error handling for GetProgress in graceful exit endpoint on the satellite side
* return proper rpc error in endpoint
* add check in chore test for checking finish timestamp and queue