A recent change made the default usage/storage limits for projects 50gb
rather than 500gb. This increases the default limit for testversions.
Change-Id: Ibea05c0d0760662e447b6455d560a2a640801c6c
version
The test-versions test currently takes 1h 40min to run each time. By
running each installation concurrently, hopefully, it will reduce the execution
time for the whole test.
Change-Id: I680c7d9945e982894b11825c9075c167f754e087
This PR does follwing changes:
1. Change oldest uplink version in the test to v0.35.3
When the test is first created, we decided to support uplink
version starting from v0.17.1, however with many API changes,
older uplinks are not usable with latest version of the network
anymore. One of the reasons being older uplinks uses deprecated
endpoint. Therefore, we will change the oldest uplink version to
the one that's using only new endpoints.
2. Disable tls certificate verification in uplink
3. Use storj-sim version control server instead of production one
4. Skip uplink version v1.3.x due to bug in that release
Change-Id: I926a6bb9829cb7181ee752437cdcb67e59197fe0
This PR fixes below issues:
1. remove concurrent installation for various versions
We were doing this to decrease the amount of execution time the versions test.
However, it's returning incorrect exit code when there's an
installation failure.
Right now, we are only installing two versions of `storj-sim` and
the rest are only doing uplink cli installation. The performance of
this test should be hugely impacted by the setup step now.
2. only remove release settings instead of deleting the entire file
uplink CLI is referrencing `private/version` package. Therefore, we
cannot delete it
3. add back `GATEWAY_0_API_KEY` in storj-sim
In order to set up older version of uplink cli, we need access to
the gate way api key.
Change-Id: Ia3c37c197bd007b6e1f7c2bd71adde42181d46f0
* add script for easy rolling upgrade test local execution
* remove unneeded binaries building for rolling upgrade and versions
tests
* unify build process for Jenkins and local execution for rolling
upgrade and versions tests
Change-Id: Ic11211b83f3f447494bbd5827d2af77ea4b20dfe
this is going to make all the tests slower but it is what it is
test-sim-aws.sh is removed because it was moved to storj/gateway repo.
Change-Id: I10727e747a4c3740b1c9054ce7d17313b4fa310b
1. only run release tags that don't contain 'rc'
2. install gateway version that's the same as satellite
3. update gateway access to contain satellite id
Change-Id: I8ca1418302c3aafdf0c4eaaf8361422a1eec2bd4
Updates config migration to occur for any v0.30.x release rather than
specifically 30.4
Also updates the config for the rolling upgrade test to use 64 kib
segments, and use smaller files for the final upload of rolling upgrade.
Change-Id: I941f77fe2b9011b45f28a5f3a2430e882d2ae6b3
Fix uplink setup step for uplink versions that requires an access field.
Update how script selects uplink versions to test.
Use significantly smaller remote files for test (performance).
Change-Id: If590b8798767e2a0621fb84cd3b8852d02f6d1da