To avoid including multiple months in a single invoice, we need all
inspector's invoice commands to run in for specific period.
See https://storjlabs.atlassian.net/browse/USR-725
Change-Id: I3637dc189234f02350daca8d897c21765762ea55
There is a subtle problem when one does a cast with `::date`. Observe:
teststorj=# set timezone = 'US/Eastern';
SET
teststorj=# select (timestamp with time zone '2020-02-01 00:00:00+00')::date;
date
------------
2020-01-31
(1 row)
teststorj=# set timezone = 'UTC';
SET
teststorj=# select (timestamp with time zone '2020-02-01 00:00:00+00')::date;
date
------------
2020-02-01
(1 row)
In order to correctly determine the date a timestamp is in, one has to
explicitly pick the time zone that the date truncation should use
otherwise postgres will use whatever setting the client has. These
tests were failing for me locally, because I run my postgres in
the US/Eastern time zone to try to tickle these bugs out. So it
should be `(x at time zone 'UTC')::date` instead of just `x::date`.
Change-Id: I4e9e32d4b53abc6165a4d0474f4702f8b9f801c7
The current satellite config lock code relies on bash scripts and
gnu diff, it must be run as root and hence it typically requires
docker. The old version will be removed at a later date..
I tried for several hours to run directly against cmdSetup() in
cmd/satellite/main.go, to avoid the ctx.Compile() call. I had no
luck.
Change-Id: I0a4888421e743b436d32b6af69d04759d7816751
See https://storjlabs.atlassian.net/browse/SM-752
These changes allow us to change the log level at runtime through a handler off of the debug endpoint.
Examples of changing the log level on storj-sim
To get the current level for the satellite api process:
curl -XGET 'http://127.0.0.1:10009/logging' --header 'Content-Type: text/plain'
To change the log level:
curl -XPUT 'http://127.0.0.1:10009/logging' --header 'Content-Type: text/plain' --data-raw '{"level":"error"}'
Change-Id: I05d164b290929fa06b6d78c01075ee41f8238044
We have 3 types of discounts:
1) Promotional credits/coupons
2) Bonus from depositing STORJ tokens
3) Stripe discounts (e.g. 100% off for Storjlings, 30% off for Early
Adopters, etc.)
So far the discounts were applied in the above order. But because the
Stripe discount is applied on all of the project usage fees, this could
sometimes lead to negative total in the invoice. Especially, if the
Stripe discount is 100% or all of the project fees are covered by
coupons and bonus.
To resolve this issue, before applying promotional coupons and deposit
bonuses, the Stripe discount will be applied first to the project fees.
Change-Id: I5dcbec04ec3a04e7f76b11e0a228ccb3195f2db0
Before:
- Discount from coupon: Promotional credits (limited time -
2 billing periods)
- Discount from credits
After:
- Promotional credits (limited time - 2 billing periods)
- Credits from STORJ deposit bonus
This way we don't mix the terms coupon and credit. And it is clearer
when the credit comes from a deposit bonus.
Change-Id: I4bba76a5501147f9de399eac41c4f157d6bda032
The billing history currently shows the Total amount from the Stripe
invoice. In fact, this value is just the amount deducted from the Stripe
balance. It does not reflect any deduction from promotional coupon or
bonus credits.
This patch adds the deducted amount form the promotional coupons and
bonus credits to the displayed amount in billing history. This way
customers have better understading of the total amount deducted from
their account balance on the satellite.
Change-Id: Ibd7f611a6cea0143a3059f39dd1d9ef21c264d8c
GetNodes returned references to nodes in the immutable state, however
some parts of code expect them to be modified.
Change-Id: I5be1866f95e0dbe062a6b6be60e29f2365c35faa
Also distinguish the purpose for selecting nodes to avoid potential
confusion, what should allow caching and what shouldn't.
Change-Id: Iee2451c1f10d0f1c81feb1641507400d89918d61
Add a flag that allows us to easily switch disqualification from
suspension mode on or off. A node will only be disqualified from
suspension mode if it has been suspended for longer than the grace
period AND the SuspensionDQEnabled flag is true.
Change-Id: I9e67caa727183cd52ab2042b0a370a1bcaebe792
Currently uploads can cause a lot of IOPS, reduce this by introducing a
in-memory buffer on-top of the file.
Change-Id: I5f4e3e01c0a36258271d180b922107de447bcb59
TestVerifierSlowDownload would sometimes not have enough nodes finish in
the allotted deadline period. This increases the deadline and also does
not assert that exactly 3 have finished. Instead, in keeping with the
purpose of the test, it asserts that the slow download is never counted
as a success and is always counted as a pending audit in the final
report.
Change-Id: I180734fcc4a499420c75164bad6253ed155d87de
CreateTables hasn't been quite true for a while now, rename to
MigrateToLatest to be clearer in it's behavior.
Change-Id: Ida48e95122a5d9b7a814e922d3698e00024a2ba7
The UpdateAddress method use to be used when storage node's checked in with the Satellite, but once the contact service was created this method was no longer used. This PR finally removes it.
Change-Id: Ib3f83c8003269671d97d54f21ee69665fa663f24
time.Now() in a short amount of time can return the exact same value.
Ensure that the test uses times that are distinct.
Change-Id: Ia653ce0af4bfcf7b5da133a9cf98b823033d9592
Before the deleter would close its done channel once, so if additional
tests shared a storagenode, even if not in parallel, the later waits
would not work properly. This fixes that problem.
Change-Id: I7dcacf6699cef7c2c2948ba0f4369ef520601bf5
CustomerRepositoryList relied on created at time for the output sorting,
however the granularity of the timer may cause multiple customers
having the same "created at" time.
Add a sleep so that every customer does get a unique time.
Change-Id: If2923174f304fa5f41260d500f6139e3fa7c3ba5
Delay of 100ms could happen due to other things happening on the test
server. Increase the time to 1s.
Change-Id: I2c7c21f966101771633d73e84cf9850d28089e71
Sometimes nodes who have gracefully exited will still be holding pieces
according to the satellite. This has some unintended side effects
currently, such as nodes getting disqualified after having successfully
exited.
* When the audit reporter attempts to update node stats, do not update
stats (alpha, beta, suspension, disqualification) if the node has
finished graceful exit (audit/reporter_test.go TestGracefullyExitedNotUpdated)
* Treat gracefully exited nodes as "not reputable" so that the repairer
and checker do not count them as healthy (overlay/statdb_test.go
TestKnownUnreliableOrOffline, repair/repair_test.go
TestRepairGracefullyExited)
Change-Id: I1920d60dd35de5b2385a9b06989397628a2f1272
When running testplanet tests, mark storagenode peer PieceDeleter as in
testing mode so that you don't have to do it on each test.
Change-Id: I2592e02c63f8bcc9152ecf436bac4e798b08bccf
Currently Cockroach isn't performant for concurrent database setup and
tear-down. Instead of a single instance allow setting multiple potential
connection strings and let the tests pick one connection string
randomly.
This improves test duration by ~10 minutes.
While we are at significantly changing how pgtest works, introduce
helper PickPostgres and PickCockroach for selecting the database to
reduce code duplications in multiple places.
Change-Id: I8ad171d5c4c8a4fc081ec2ae9bdd0cc948a80619
In cases like the segment reaper script connecting to the metainfodb,
we don't want a db migration to happen automatically when we call
metainfo.NewStore. This adds MigrateToLatest method for postgreskv
and cockroackv, and calls MigrateToLatest in places where NewStore used
to create tables.
Change-Id: I682d0f26d609af0601dfdb32a24866cdf5d32a7e