This document describes a new state, suspension, which nodes will
be placed in if they respond to too many audits with "unknown" errors.
When in this state, node operators will have to fix their node within a
certain amount of time, or they will be disqualified. While nodes are
suspended, they will not be able to receive new data.
Change-Id: I543f27ada66d8b40fc52ca8ead8ecc8479326bad
we want to return back to the user as quick as possible but also keep
deleting remaining pieces on the storagenodes
Change-Id: I04e9e7a80b17a8c474c841cceae02bb21d2e796f
The code to generate monkit.lock has a bug where it doesn't take
ScopeNamed into account and assumes the package. Since the downgrade
file was created from monkit.lock, we also assumed the package, so
we were downgrading to the wrong metric.
No other places call ScopeNamed that would cause a problem.
Change-Id: If9fbbd971a7d755f5de33ed20b8a6bcc95670ee3
Curently, storage nodes only report their capacity to satellites
once per hour. If a node fills up, it will fail all uploads until
the next contact cycle begins. With these changes, at the end of an
upload we check whether the MinimumDiskSpace threshold has been
passed. If so, trigger the monitor chore to update the node's
capacity, then trigger the contact chore to report the new
capacity to the satellites
Change-Id: Ie6aadaade1e2c12c87e03f8ff9059a50121380a0
Enhance the documentation of the UseSerialNumber method (interface and
implementation) and add several missing dots in doc comments of the
methods of the same interface and implementation.
Change-Id: I792cd344f0d2542e060fa2ec288b71231cae69de
at the end of tally iteration, in order to set the new live
accounting totals, we were iterating over all live accounting
projects. We found a bug with this when running storj-sim. If
we restarted the satellite live accounting would be cleared
because storj-sim was running the live accounting redis instance.
Since live accounting was cleared, at the end of tally, even if
it found data in projects, we would not update the live accounting
totals because we were iterating over the projects from live
accounting to do so. We now iterate over projects found from tally
in order to update live accounting
We also found that if a user deleted everything from their project,
tally would not find it and the live accounting would not be updated.
For this reason, we merge live accounting projects into tally projects
Change-Id: If0726ba0c7b692d69f42c5806e6c0f47eecccb73
rationale: if GC kills the satellite, it would be nice to make
it through a repair checker sweep first
Change-Id: Id56171dc8e13940cfb6481e36a910bad077a01ed
Trace the calls to DeletePiecesService.DeletePieces method and add
metrics for having statistics about the rate that specific storage node
is dialed and duration time spent on dialing storage nodes.
These statistics will help us to find out if we should implement
connections queues to storage node for reducing the deletion time in cae
that we see that we're spending too much time dialing frequent storage
nodes.
Ticket: https://storjlabs.atlassian.net/browse/SM-85
Change-Id: I9601676c3a8ad96c73c93833145929e4817755e2
rate
Graceful exit is very slow at the moment. Over the last couple days we
increase the batch size on Stefans satellite to 1000 but as a side
effect the error rate was increased. With a batch size of 500 the error
rate looks stable.
This PR will increase the default to batch size to 300. Graceful exit
will still be painful slow but at least it will be a bit faster. At the
same time this PR also increases the number of errors we tolerate. We
don't want to DQ slow storage nodes just because they didn't finish all
300 transfers in time. We want to give them more retries.
Change-Id: I92e3f99e116d4988457d8b902a88e85ed1bcc1a7
Fixes https://storjlabs.atlassian.net/browse/USER-240
- Adds UnsynchronizedPut method to metainfo service that overwrites any
existing pointer under the same path
- Uses UnsynchronizedPut in the metainfo endpoint for committing the
segments
Change-Id: Icb43f31ea33f14066ca9dfdcf226eb3079b90948
if redis crashed in the middle of tally we could have a situation
where we erroneously subtract from a project total. Currently,
`latest` should never be less than `initial`
Change-Id: Ibb5ab724ac0ad4d684f7954fad7a9e061104b7df
Currently SNs report their free disk space once per hour. If a node
becomes full, it has to wait until the next contact cycle begins to
report; all the while receiving and failing upload requests. By increasing
the minimum required disk space, we can give the storage nodes more time
to report their space before the completely fill up. This change goes
hand-in-hand with another change we want to implement: trigger capacity
report on SN immediately upon falling below threshold.
Change-Id: I12f778286c6c3f582438b0e2949765ac43325e27
This change resolves all the storage node addresses to their IP addresses
before giving them to the uplink so that the uplink doesn't have to resolve
a hundred hosts and can immediately connect to improve uplink performance.
Change-Id: Idb834351e0fece409d74c8a1c29b0b8c9b09c9ff
This peer will contain our administrative panels.
It's completely separated from our other satellite
processes because it allows better control for restricting
access to it.
Change-Id: Ifca473bee82ff6c680b346918ba32b835a7a6847