When the context was being cancelled the error was being discarded within the rate limiting error handling which caused tests to fail.
Change-Id: I5c6458c16da09a11531233ea0ee80d914969cb3f
As per discussed we decided to rate limit how fast we iterate through
the metainfo database in the metainfo loop. This puts in place a
mechanism for rate limiting and burst limiting if need be in the future.
The default for this rate limiting is still no limits so it stays the
same as our previous functionality.
Change-Id: I950f7192962b0e49f082d2c4284e2d52b0a925c7
* satellite/metainfo: Rollback path parts check in loop
We have to rollback the changes applied in checking the rawPath parts
from 4 to 3 because the production prointerDB is still storing buckets.
* satellite/metainfo: Don't return path parts less 4
Don't return an error in the metainfo loop iterator when a path doesn't
have 4 parts because it belongs to bucket metadata, not an actual